This glossary explains 26 energy terms that Belgian companies meet on their energy bill, in letters from their grid operator and in offers for batteries and charge points. Each term starts with a short, plain definition and links to related terms, guides and solutions.
- Grid costs: capacity tariff, peak shaving, grid connection capacity
- Markets: day-ahead market, imbalance, FCR, aFRR and mFRR
- Technology and mobility: battery, EMS, OCPP, ISO 15118, vehicle-to-grid
All terms from A to Z
- aFRR (automatic Frequency Restoration Reserve)
- aFRR (automatic Frequency Restoration Reserve) is a balancing reserve where Elia sends automatic set-points every few seconds to restore the grid balance, with full delivery within 5 minutes.
- Aggregator
- An aggregator bundles the flexibility of many batteries, EV chargers and flexible loads into one pool and sells it on energy and balancing markets, such as Elia's aFRR.
- Ancillary services
- Ancillary services are services that grid operator Elia buys to keep the Belgian grid stable, such as balancing reserves (FCR, aFRR, mFRR), voltage control and black start.
- Balancing responsible party (BRP)
- A balancing responsible party (BRP) is a company that must keep injection and offtake in its Belgian portfolio balanced every quarter-hour and settles any imbalance with Elia.
- Battery energy storage system (BESS)
- A battery energy storage system (BESS) is a company-scale battery with inverter and controls that stores electricity when it is cheap or plentiful and releases it when needed.
- Capacity tariff
- The capacity tariff is the part of your network costs in Flanders based on your highest 15-minute power peak each month, not only on the kWh you use.
- Day-ahead market
- The day-ahead market is the daily auction where electricity for each 15-minute period of the next day is bought and sold, setting the Belgian day-ahead price that dynamic contracts follow.
- Dynamic energy contract
- A dynamic energy contract is an electricity contract where the energy price changes every hour or quarter-hour, following the Belgian day-ahead market price.
- Energy arbitrage
- Energy arbitrage means storing electricity when it is cheap and using or selling it when it is expensive, usually with a battery, to earn from price differences.
- Energy management system (EMS)
- An energy management system (EMS) is software that measures and steers your solar panels, battery, charge points and other loads together, to cut costs and stay within grid limits.
- EPEX SPOT
- EPEX SPOT is the European power exchange where electricity for Belgium is traded a day ahead and on the day itself; its day-ahead result is the Belgian reference price.
- FCR (Frequency Containment Reserve)
- FCR (Frequency Containment Reserve) is the fastest balancing reserve: batteries and other assets automatically adjust their power within 30 seconds when grid frequency moves away from 50 Hz.
- Grid congestion
- Grid congestion happens when part of the electricity grid is close to its limit, so the network operator cannot connect new users or extra power there without restrictions.
- Grid connection capacity
- Grid connection capacity is the maximum power your site can draw from or inject into the grid at once, set by your connection and contract, usually expressed in kVA.
- Grid injection
- Grid injection is the electricity your site sends back into the public grid, usually surplus solar power that you do not use yourself at that moment.
- Imbalance
- Imbalance is the difference, per quarter-hour, between the electricity a market party planned to take from or put on the Belgian grid and what actually happened.
- ISO 15118
- ISO 15118 is the international standard for communication between an electric vehicle and a charging station, enabling Plug & Charge, smart charging and, in ISO 15118-20, bidirectional charging.
- kW vs kWh
- A kilowatt (kW) measures power, how much electricity you use at one moment; a kilowatt-hour (kWh) measures energy, how much you use over time.
- Load balancing
- Load balancing automatically shares the available power between charge points and other loads, so cars charge as fast as possible without overloading your grid connection.
- mFRR (manual Frequency Restoration Reserve)
- mFRR (manual Frequency Restoration Reserve) is a balancing reserve that Elia activates on request for larger or longer imbalances, with full delivery within 12.5 minutes.
- Negative electricity prices
- Negative electricity prices occur when supply exceeds demand so much that sellers pay to deliver power; in Belgium this mostly happens around midday on sunny, low-demand days.
- OCPP (Open Charge Point Protocol)
- OCPP (Open Charge Point Protocol) is the open communication standard between an EV charging station and the software that manages it, used for sessions, billing and smart charging.
- Peak shaving
- Peak shaving means lowering your highest moments of electricity use, with a battery or smarter EV charging, so you pay less for capacity and stay within your grid connection.
- PV curtailment
- PV curtailment means deliberately lowering or pausing the output of your solar panels, for example when injecting would cost money or the grid cannot take more power.
- Self-consumption
- Self-consumption is the share of the electricity from your own solar panels that you use on site at the moment it is produced, instead of injecting it into the grid.
- Vehicle-to-grid (V2G)
- Vehicle-to-grid (V2G) means an electric car's battery sends electricity back to the grid through a bidirectional charger, so parked vehicles can help balance supply and demand.