In short
- 500 kW
- Power
- 1,290 kWh
- Capacity
The challenge
A new logistics centre is going to be built in Harelbeke. In anticipation of that, a large C&I battery (C&I means commercial and industrial) had to be installed on site.
The goal: use this large-scale battery to earn revenue by taking part in flexible energy markets.
The solution
BeLoaded installed a 500 kW / 1,290 kWh containerised BESS in Harelbeke. A BESS (battery energy storage system) is a large battery that stores electricity on site.
The battery takes part in markets such as:
- FCR: a fast reserve that reacts within seconds to keep the grid frequency stable.
- aFRR: an automatic reserve that helps restore the balance of the grid within minutes.
The energy management system (EMS) decides when the battery charges and discharges, based on market signals.
The result
The battery can be operated commercially in the period before the logistics centre is built. It earns revenue through the FCR and aFRR markets and gives flexibility to the electricity grid at the same time.
See how BeLoaded runs batteries on energy markets: flexibility management.
“What makes the difference for us is that BeLoaded doesn’t just want to sell batteries. They really think along about optimising the site and sizing it as well as possible, so we can achieve the maximum return in line with our own goals.”