In short
- 1.5 MW
- Combined battery power
- 3.87 MWh
- Total battery capacity
- 600 kWp
- Planned solar installation
- 60+
- Planned AC and DC charge points
The challenge
The owner of the Anderlecht site wanted the battery investment to pay off: the aim is to maximise financial returns and keep the payback period of the investment as short as possible.
The solution
BeLoaded installed three large BESS systems with a combined power of 1.5 MW and a total capacity of 3.87 MWh. A BESS (battery energy storage system) is a large battery that stores electricity on site.
Right now, the batteries are used only for energy trading via an aggregator: a company that bundles flexible assets such as batteries and sells their flexibility on energy markets.
What’s next
In the long term, the site will be expanded with:
- a 600 kWp solar installation;
- more than 60 AC and DC charge points.
The goal then is to maximise self-consumption of the locally generated solar energy for the charging infrastructure, so the chargers run on the site’s own solar power as much as possible. The energy management system (EMS) is configured to lower the capacity tariff, the part of the grid bill based on your peak power.
See how BeLoaded earns money with batteries on energy markets: flexibility management.