In short
- 100%
- Previous connection to the imbalance market
The challenge
The installation in Turnhout was previously configured for a 100% connection to the imbalance market: the market that pays for helping the grid when supply and demand do not match in real time. That setup was not achieving the expected financial returns.
The solution
BeLoaded took over responsibility for the total installation and made these changes:
- New EMS focus. BeLoaded migrated the energy management system (EMS) so its primary focus is now self-consumption (using the site’s own energy on site) and DC load balancing (sharing power between the DC chargers). This minimises peaks and lowers the contracted volumes.
- Regularisation. BeLoaded brought the battery in line with the fire-safety rules (fire police) and with the grid operator’s telecontrol, the remote control the grid operator needs over the battery.
The result
BeLoaded now carries out the daily follow-up of the installation, aiming for the maximum financial return.
See how BeLoaded steers batteries, solar power and chargers together: energy management system.