In short
- 115 kWp
- Solar installation
- 215 kWh
- Battery capacity
- 3
- EV chargers
The challenge
The main goal in Zandhoven is full PV self-sufficiency: the site wants to run on its own solar power and optimise its energy use from March to September.
The solution
BeLoaded combined two parts:
- a 115 kWp solar installation;
- a 215 kWh modular ZBox200 battery (BESS, short for battery energy storage system).
All surplus solar production is stored in the battery. The site uses it when the panels do not produce enough.
There are also three EV chargers on site. The energy management system (EMS) uses dynamic load balancing for them: it shares the available power between the chargers in real time.
The result
All excess solar production goes into the battery and is used on site when solar generation falls short. That is self-consumption: using your own solar power on site. The EMS spreads the energy efficiently over the three EV chargers.
See how BeLoaded shares power between chargers: load balancing.