In short
- 500 kW / 1 MWh
- Battery
- 90 kW
- Available capacity before
- almost 600 kW
- Available capacity after
The challenge
A logistics customer in the port of Antwerp wanted to electrify its operations and switch to electric trucks. But the site did not get enough grid connection capacity, the maximum power it may draw from the grid, to make that move.
The solution
BeLoaded installed a 500 kW / 1 MWh battery. Two things changed:
- The energy the site produces itself is no longer injected into the grid. There is no more grid injection, which means sending your own power back into the grid.
- Electricity is bought at the lowest rate on the market. Buying when power is cheap and using it later is called energy arbitrage.
The result
The total available capacity went from 90 kW to almost 600 kW.
Want to know how a battery can create room on your grid connection? See company batteries.