Antwerp: a battery took a port logistics site from 90 kW to almost 600 kW of available capacity

Port of Antwerp, Belgium · Logistics

Battery installation at a logistics site in the port of Antwerp

In short

A logistics company in the port of Antwerp did not get enough capacity from the grid to switch its operations to electric trucks. BeLoaded installed a 500 kW / 1 MWh battery: the site no longer injects its own energy into the grid and buys electricity at the lowest market rate. The total available capacity rose from 90 kW to almost 600 kW.
500 kW / 1 MWh
Battery
90 kW
Available capacity before
almost 600 kW
Available capacity after

The challenge

A logistics customer in the port of Antwerp wanted to electrify its operations and switch to electric trucks. But the site did not get enough grid connection capacity, the maximum power it may draw from the grid, to make that move.

The solution

BeLoaded installed a 500 kW / 1 MWh battery. Two things changed:

  • The energy the site produces itself is no longer injected into the grid. There is no more grid injection, which means sending your own power back into the grid.
  • Electricity is bought at the lowest rate on the market. Buying when power is cheap and using it later is called energy arbitrage.

The result

The total available capacity went from 90 kW to almost 600 kW.

Want to know how a battery can create room on your grid connection? See company batteries.