The answer is yes, under the following conditions:
- No modifications are needed to the transformer or the main low-voltage switchboard (ALSB);
- The installation operates within the existing contracted capacities;
- The RTU requirement imposed by the grid operator is integrated into the EMS;
- The battery is installed behind the NOB panel of the PV installation;
- The battery concept is based on monoblock batteries.
Alternatively, a Battery-as-a-Service model can be used, delivering an annual return of 25–30%.